Water Evaporation Pond in Semnagan

Water Evaporation Pond in Semnagan Execution: 2008 Area: 12,000 m² Materials: HDPE Geomembrane, Geotextile Execution Duration: 12 days Project Description The water evaporation pond project in Semnagan began in 2008 and was completed within 12 days. The project covered an area of 12,000 m² and aimed to create a pond equipped with an effective […]