حوضچه گل حفاری لامرد

Lamerd Drilling Mud Pond

Execution: 2020 (1399)
Area: 14,000 m²

Materials: Black geomembrane (1.5 mm thickness) and geotextile

The drilling mud pond project in Lamerd started in 2020 and lasted for 14 days. The project covered an area of 14,000 square meters and aimed to construct a pond with a reliable and efficient isolation system for storing and managing drilling mud. The project used black geomembrane sheets with a thickness of 1.5 mm and geotextile as reinforcing and isolation layers.

The black geomembranes were chosen for their high water resistance and long lifespan, making them suitable for this project. Geotextiles also improved the performance of the isolation system and enhanced the durability and stability of the pond. Precise execution and the use of high-quality materials guaranteed the efficiency and long-term lifespan of this project.

Contact Polymer Industry Consultants

To receive free expert advice, information about prices, and to place an order, you can contact our experts at Khanjani Polymer Industries.