Lamerd Drilling Mud Pond
Execution: 2020 (1399)
Area: 14,000 m²
Materials: Black geomembrane (1.5 mm thickness) and geotextile
The drilling mud pond project in Lamerd started in 2020 and lasted for 14 days. The project covered an area of 14,000 square meters and aimed to construct a pond with a reliable and efficient isolation system for storing and managing drilling mud. The project used black geomembrane sheets with a thickness of 1.5 mm and geotextile as reinforcing and isolation layers.
The black geomembranes were chosen for their high water resistance and long lifespan, making them suitable for this project. Geotextiles also improved the performance of the isolation system and enhanced the durability and stability of the pond. Precise execution and the use of high-quality materials guaranteed the efficiency and long-term lifespan of this project.