ایزولاسیون وزهکشی تونل کوهین

Insulation and Drainage in Kuhin Tunnel

Execution: 2013

Area: 5,000 m²

 

Materials: PVC Geomembrane, Geotextile

In 2013, the insulation and drainage project in Kuhin Tunnel was initiated and completed within a short period. This project aimed to establish a comprehensive drainage protection system inside the tunnel, covering an area of 5,000 m². Materials such as PVC geomembrane and geotextile were used to achieve insulation and protect the tunnel. The PVC geomembrane was the ideal choice for this project due to its high flexibility and excellent water resistance. The project was executed with precision using the latest technologies to ensure long service life and high efficiency, significantly enhancing the tunnel’s usability.

Contact Polymer Industry Consultants

To receive free expert advice, information about prices, and to place an order, you can contact our experts at Khanjani Polymer Industries.